AiR MAX four-hose machine prepared for a measured Nitro pilot

Pilot details

Prove it.
Then scale it.

A funded, measured trial designed to test customer demand, pressure retention, machine reliability and partner economics before rollout.

What gets measured

Evidence, not a showcase.

No AiR pilot is live and no outcome is presented as achieved. The first deployment is built to create a complete evidence record, including results that challenge the proposition.

Pressure outcome

Entry pressure, approved target, correction and repeat condition for all four tyres.

Nitrogen integrity

Delivered purity, pressure retention and every air top-up recorded rather than assumed.

Commercial fit

Session time, uptake, repeat use, uptime, service cost and host economics.

Twelve-week operating window

Four gates. One honest decision.

01

Instrument

Freeze calibration, safety controls, data definitions and success measures.

02

Operate

Run live services across a representative mix of sites and fleet vehicles.

03

Compare

Measure retention, repeat behaviour, reliability and economics against controls.

04

Decide

Scale, extend or stop against rules agreed before installation.

Decision rules

Agree the stop conditions first.

  • Independent calibration and safety checks before public operation.
  • Every pressure, purity and uptime result included in the final evidence pack.
  • No rollout claim unless reliability, adoption and economics clear agreed thresholds.
  • Nitrogen compared with correctly maintained compressed air, not neglected tyres.